AI Contract Management Software: Why Contracts Need Procurement Context, Not Just a CLM
Poor contract management erodes 8.6% of annual value, according to World Commerce & Contracting research published in August 2025. Contract management has become the most contested battleground in procurement technology. Every major vendor now claims AI-powered contract capabilities: automated review, clause extraction, compliance monitoring, risk scoring. Yet most of these tools operate in isolation. They analyze contracts without access to the intake request that initiated them, the vendor history that contextualizes them, or the spend data that determines whether the terms are actually favorable. The result is a generation of AI contract management software that is technically impressive and operationally disconnected. Organizations evaluating these platforms need to understand a fundamental architectural question: does the AI review contracts in context, or in a vacuum?
By Lihi Lutan, Co-Founder and CEO, Opstream
Co-Founder and CEO of Opstream, previously COO of StokeTalent (acq. Fiverr) and VP Operations at Taboola where she helped scale the company from $8M to $1B in revenue.
● Standalone CLM tools review contracts without access to procurement context: the intake request, vendor history, compliance status, and spend data that determine whether contract terms are favorable.
● Gartner classifies Contract Life Cycle Management as a “Growing” market and Procurement Orchestration Platforms as “Emerging,” signaling that the two categories are converging.
● A seven-platform comparison reveals wide variance in how vendors integrate contract AI with the broader procurement lifecycle, from pure CLM specialists to full procure-to-pay platforms.
● With 60% of large IT services contracts expected to include AI clawback clauses by 2028, the volume and complexity of contract review is accelerating beyond what manual processes can handle.
What Is AI Contract Management and Why Does It Matter for Procurement?
AI contract management software uses artificial intelligence to automate contract creation, review, negotiation, compliance monitoring, and renewal across the contract lifecycle. In procurement, this matters because contracts are the binding agreements that govern every vendor relationship, every spend commitment, and every compliance obligation. When contract review is slow, approvals stall. When contract terms go unmonitored, organizations pay for obligations they did not intend to accept.
Gartner defines the contract life cycle management market as “a solution that proactively manages contracts from initiation through negotiation, execution, compliance and renewal. In this context, a contract is any agreement or contractual document containing rights and obligations that affect an organization now or in the future.” That definition captures the scope of the challenge: contracts are not just legal documents. They are operational commitments that affect procurement, finance, legal, IT, and security simultaneously.
The market is responding to this complexity. According to Gartner’s June 2026 research on top technology markets for CPOs, Contract Life Cycle Management is classified as a “Growing” market, while Procurement Orchestration Platforms are classified as “Emerging.” The convergence of these two categories reflects a fundamental shift: organizations no longer want a standalone tool that manages contracts in isolation. They want contract intelligence embedded in the platform that orchestrates their entire procurement operation.
This is where the current generation of AI contract management tools diverges. Some platforms, like Ironclad, have built exceptional AI for contract review, drafting, and risk analysis within the CLM silo. Others, like Coupa and SAP Ariba, offer contract modules within massive source-to-pay suites. And a smaller number of platforms, including Opstream, embed AI contract capabilities directly in the procurement workflow, connecting contract review to intake, approvals, vendor lifecycle management, and invoice reconciliation.
The question for procurement leaders is not “which platform has the best AI contract features?” It is “which platform connects contract intelligence to the data and workflows where it creates the most value?”
The Problem with Standalone CLM: Why Contracts Need Procurement Context
Standalone CLM tools operate on a fundamental assumption: that contracts can be effectively managed as independent documents. The AI reviews clauses, extracts metadata, identifies risks, and routes for approval. All of this happens without knowing why the contract exists, who requested it, what the organization has already spent with this vendor, or whether the vendor’s compliance certifications are current.
This creates three operational gaps that no amount of AI sophistication can close.
Gap 1: No connection to the procurement request
When a contract arrives for review in a standalone CLM, the reviewer sees the document but not the context that produced it. Was this a competitive bid or a sole-source decision? Did the requester specify budget constraints? Were there alternative vendors evaluated? In an integrated platform, the contract is linked to the intake request that initiated the procurement. The reviewer sees the original business justification, the spend category, the budget allocation, and the approval history. This context changes how contract terms are evaluated.
Gap 2: No connection to vendor history
A standalone CLM may know that this is a renewal contract, but it does not know the full vendor relationship. It cannot see that the same vendor has three open support tickets, a pending compliance recertification, and a pattern of scope creep across previous engagements. In an integrated platform, the contract reviewer sees the complete vendor record: prior contracts, spend trajectory, compliance status, risk scoring, and performance history. The contract is reviewed with the full weight of the vendor relationship, not just the legal text on the page.
Gap 3: No connection to downstream processes
After a contract is signed in a standalone CLM, the terms need to be manually communicated to procurement (for PO creation), finance (for budget allocation), IT (for system provisioning), and compliance (for ongoing monitoring). Each handoff is a potential failure point. In an integrated platform, contract approval triggers automated downstream actions: PO creation in the connected ERP, vendor record updates, compliance tracking activation, and renewal reminder scheduling. The contract is not an endpoint. It is a checkpoint in a continuous workflow.
Gartner advises procurement technology leaders: “Clarify roles, structure legal workflows and contract data before deploying CLM solution. Standardize contract processes and specify roles as a foundation for streamlined implementation.” Without that procurement context, CLM implementation stalls at the technology layer without transforming the underlying process.
How AI Is Transforming Contract Review, Compliance, and Risk Management
Contracts are one of the first places procurement AI is actually being used. The Hackett Group reports that “Current AI use is concentrated in areas such as contract management, market intelligence, and spend analytics” (The Hackett Group, March 17, 2026).
AI is changing contract management at three levels: review speed, compliance automation, and risk intelligence. The most impactful applications go beyond document summarization to deliver actionable analysis that directly affects procurement decisions.
AI-Powered Contract Review
Traditional contract review requires legal or procurement professionals to read every page, compare terms against organizational standards, and flag deviations manually. For a 50-page renewal contract, this can consume hours. AI contract review automates the comparison by analyzing a new document against the organization’s approved playbook or the previously approved version of the same agreement.
Opstream’s AI Document Comparison represents a specific implementation of this capability. When a vendor submits a renewal contract, updated DPA, security exhibit, or pricing attachment, the system compares it against the previously approved version and categorizes every change by domain: legal terms, commercial conditions, privacy and security, intellectual property, liability, and termination. Materiality flags highlight which changes require attention versus which are cosmetic. A side-by-side viewer shows additions, removals, and modifications with color-coded highlighting.
This is not contract summarization. It is change detection with categorized risk analysis. The difference matters because legal and procurement reviewers do not need a summary of what the contract says. They need to know what changed since the last version, and whether those changes create new risk or commercial exposure.
Automated Compliance Monitoring
Contract compliance extends beyond the signing event. Organizations need to track obligations, deadlines, auto-renewal triggers, and regulatory requirements across hundreds or thousands of active agreements. AI automates this monitoring by extracting key dates and obligations during the review process and then tracking them continuously against organizational policies.
In Opstream, compliance monitoring is embedded in the procurement workflow. Vendor questionnaires, security reviews, and policy checks are part of the approval flow, not a separate step. Configurable playbooks define the contract terms, clauses, and internal policies that the Contract Review Agent evaluates against, flagging deviations from standard terms automatically. Requests cannot advance until compliance gates are cleared. This architectural distinction means that compliance is proactive (enforced before approval) rather than reactive (discovered after the contract is signed).
Gartner’s recommendation reinforces this approach: “Prioritize mature, proven AI use cases such as machine learning for spend analytics, supplier risk scoring, and contract compliance monitoring, as well as generative AI for automated document summarization and enhanced supplier communications to capture immediate value.”
Risk Intelligence Across the Contract Portfolio
The most advanced AI contract management capabilities go beyond individual document analysis to provide portfolio-level risk intelligence. This includes identifying patterns across contracts: vendor concentration risk, non-standard clause proliferation, auto-renewal exposure, and compliance certification gaps across the supplier base.
This portfolio view is only possible when contract data is unified with vendor, spend, and compliance data. A standalone CLM sees contracts. An integrated platform sees contracts in the context of every vendor interaction, every spend transaction, and every compliance event. The risk intelligence that emerges from this unified view is qualitatively different from what any single-purpose tool can deliver.
AI Contract Management as Part of Procurement Orchestration
Procurement orchestration unifies intake, routing, approvals, contracting, vendor management, invoicing, and analytics into a single operational layer. When AI contract management is embedded in this orchestration, it gains access to data and context that fundamentally changes what the AI can do.
Gartner describes this transformation directly: “AI-driven orchestration transforms procurement from a collection of disconnected processes into a unified, intelligent function that delivers governance, compliance, and speed. It unifies procurement workflows, data, systems, and decisioning into a single, intelligent operating layer.”
Here is how contract management changes when embedded in procurement orchestration:
At intake, the system already knows the contract context. When a requester submits a renewal request through Opstream’s Adaptive Intake, the platform pre-fills intake fields by drawing on connected ERPs, vendor history, and the existing contract record. The reviewer receives the contract with full context attached: the original request, the approval history, the spend trajectory, and the vendor compliance status.
During review, AI Document Comparison analyzes the new contract against the approved version. Changes are categorized and flagged by materiality. But unlike a standalone CLM, the reviewer also sees whether the vendor has open compliance issues, whether spend with this vendor has exceeded projections, and whether similar terms were recently flagged in contracts with other vendors. The review happens in context, not in isolation.
At approval, concurrent multi-stakeholder review replaces sequential handoff chains. Procurement, legal, finance, IT, and security review in parallel. Conditional routing adjusts the approval path based on contract value, risk classification, and vendor category. Compliance gates prevent advancement until requirements are met. Approval brackets define spend-level authority that applies across all workflows.
After signing, the platform executes downstream actions automatically. Purchase orders are created in the connected ERP. Vendor records are updated. Compliance monitoring activates. Renewal reminders are scheduled based on contract terms. The system does not wait for a human to notice a deadline. It acts because it has the data, the rules, and the authority to execute.
At renewal, the cycle begins again. But now the platform has accumulated intelligence from the previous contract period: actual spend versus committed spend, compliance history, vendor performance, and any issues flagged during the engagement. The renewal review is richer because every previous interaction is part of the record.
45%
increase in spend under management
73%
faster request handling
30 to 45
days to typically go live, with zero-code configuration
81%
reduction in shadow procurement
AI Contract Management Platform Comparison: 2026
The following comparison evaluates seven platforms across the dimensions that matter most for AI contract management within procurement. These assessments are based on publicly available product documentation, analyst research, and platform capabilities as of June 2026.
AI Contract Management Platform Comparison 2026
AI Contract Review: Opstream offers AI Document Comparison with categorized change analysis, materiality flags, side-by-side viewer, and reviews terms against company playbooks and policies. Coupa provides AI metadata extraction, GenAI contract summaries, and risk-informed clause recommendations via Compose. Zip offers AI Contract Orchestration with automated review against legal playbook with full intake context. SAP Ariba has Joule-assisted contract support with deviation and compliance scanning. Jaggaer provides Contracts AI with NLP metadata extraction and clause identification. Ironclad has Review Agent, Drafting Agent, Editing Agent, and AI Assistant. CloudEagle offers AI metadata extraction for renewal dates and payment terms.
Data Architecture: Opstream has a unified semantic model with entity resolution across ERPs, CLMs, HRIS, and compliance tools. Coupa uses community intelligence from aggregated network data. Zip has a procurement-native data model with MCP for AI connectivity. SAP Ariba uses BTP-based architecture with Joule integration. Jaggaer provides spend analytics with AI classification. Ironclad has a contract-centric data model with limited procurement data access. CloudEagle offers SaaS discovery and governance data.
Procurement Lifecycle: Opstream covers full intake, approvals, PO, invoice reconciliation, vendor lifecycle, renewals, and analytics. Coupa covers full S2P. Zip covers intake, approvals, PO, and contract orchestration. SAP Ariba covers full S2P. Jaggaer covers full S2P. Ironclad is CLM only. CloudEagle covers SaaS management.
Compliance Integration: Opstream provides configurable playbooks and an internal policy compliance framework with compliance gates embedded in the approval flow that block advancement until requirements are met. Coupa offers risk-informed clause recommendations with compliance embedded across S2P modules. Zip enforces policy via governed agents. SAP Ariba provides contract deviation scanning within SAP ecosystem. Jaggaer offers regulatory tracking and supplier compliance management. Ironclad has contract-level risk identification with no procurement compliance integration. CloudEagle offers SaaS compliance and AI governance.
Implementation Timeline: Opstream is typically live within 30 to 45 days with zero-code configuration. Coupa requires 6-18 months. Zip takes weeks to months. SAP Ariba is rolling out through 2026-2027. Jaggaer requires 6-12 months. Ironclad deploys in weeks for CLM. CloudEagle deploys in weeks for SaaS management.
Category Coverage: Opstream covers all categories including software, services, hardware, consulting, facilities, and indirect spend. Coupa focuses on indirect spend. Zip covers all categories. SAP Ariba covers direct and indirect. Jaggaer covers direct and indirect. Ironclad is category-agnostic for contracts. CloudEagle covers SaaS only.
AI Invoice Reconciliation: Opstream provides AI-powered 3-way matching with confidence scoring and automated exception routing. Coupa has mature AP with AI-driven invoice matching. Zip announced AP agents in 2026. SAP Ariba offers invoice processing within S/4HANA. Jaggaer provides AP automation with invoice matching. Ironclad has no invoice processing. CloudEagle has no native invoice matching.
The comparison reveals a structural choice. Ironclad and CloudEagle operate in focused domains (CLM and SaaS management, respectively) with strong AI within that scope but no procurement lifecycle coverage. Coupa, SAP Ariba, and Jaggaer offer contract management as one module within massive S2P suites, requiring months of implementation to deploy. Zip has extended into contract orchestration from an intake-first starting point, with AP capabilities still emerging. Opstream integrates AI Document Comparison into a full procure-to-pay platform that goes live in weeks, connecting contract review to intake, approvals, vendor lifecycle management, and invoice reconciliation.
What Should You Evaluate When Choosing AI Contract Management Software?
The proliferation of AI contract management claims makes evaluation difficult. Every vendor now highlights AI capabilities. The criteria below separate platforms that deliver contract intelligence from those that deliver contract features.
Implementation matters as much as the feature list. “Gartner analyzed 162 Peer Insights reviews to identify lessons learned while implementing CLM solutions” (Gartner, “Peer Lessons Learned for Contract Life Cycle Management Solution Implementation,” May 29, 2026). When you check references, ask peers what slowed their rollout, not only what the AI can do.
1. Does the AI review contracts in procurement context, or in isolation?
Ask your vendor: when a contract is flagged for review, does the reviewer see the original intake request, the vendor’s compliance status, the spend history, and the approval trail? Or does the reviewer see only the document? This is the architectural question that determines whether AI contract review informs procurement decisions or operates as a separate legal exercise.
Opstream connects every contract to the request that initiated it, the vendor record that contextualizes it, and the approval workflow that governs it. AI Document Comparison surfaces changes in the context of the full vendor relationship, not as an isolated document analysis.
2. What happens after the contract is signed?
In a standalone CLM, the contract is stored and monitored. In a procurement orchestration platform, the signed contract triggers a cascade of automated actions: PO creation, vendor record updates, compliance tracking, budget allocation, and renewal scheduling. Ask your vendor what happens automatically after contract execution. If the answer requires manual handoffs to other systems, the platform is creating integration work, not eliminating it.
3. Can the platform handle contracts across all procurement categories?
Some platforms that originated in SaaS management or software procurement apply the same contract framework to every category. But a consulting services agreement has different risk dimensions than a software license. A facilities management contract has different compliance requirements than a hardware purchase. Your contract management system should adapt its review criteria, compliance checks, and approval routing based on the procurement category. Test this: can the platform review a legal services engagement contract with the same rigor it applies to a SaaS renewal?
4. How does the platform handle the contract renegotiation cycle?
With Gartner predicting that “by 2028, 60% of large IT services contracts will include AI clawback clauses,” the volume and complexity of contract renegotiation is increasing. Ask your vendor: does the system proactively surface renegotiation opportunities based on spend data, vendor performance, and market conditions? Or does it wait for a human to initiate the process?
Opstream’s autonomous workflows monitor contract terms, spend patterns, and vendor performance continuously. The system triggers renewal workflows proactively, surfaces renegotiation recommendations based on spend trends, and ensures compliance documents are current before the renewal process begins.
5. What is the data architecture beneath the AI?
AI contract management is only as good as the data it operates on. If the same vendor is coded differently across systems, contract analysis will produce inconsistent results. If contract metadata is not connected to spend data, the system cannot identify whether terms are commercially favorable. Ask your vendor: does the platform unify vendor, contract, spend, and compliance data into a single model, or does it rely on point-to-point integrations that each system must maintain?
Opstream’s unified semantic model resolves duplicate vendors, contracts, and purchase orders across connected systems. Entity resolution ensures that “Acme Corp” in NetSuite, “ACME Corporation” in SAP, and “Acme” in Salesforce are recognized as a single entity. Every AI analysis operates on this resolved, enriched data, not on raw, fragmented records.
When should renewal reviews start?
Start early enough to still have options. If review begins after the notice window has closed, the only choices left are to accept the vendor’s terms or scramble. For significant contracts, many teams start at least 90 days out, and earlier for strategic contracts that may need a competitive process.
In Opstream, workflows can trigger a set number of days before a date, for example 90 days before the renewal date or contract expiry. The workflow brings the current contract from the document repository, spend to date and vendor compliance status into one request, so the owner, finance and legal start from the same facts. For the request side, see our guide to renewal and termination requests, and for software, software license lifecycle and renewal management. Early renewal reviews are what make the renegotiation supercycle below manageable.
The Contract Renegotiation Supercycle: Why AI Contract Management Matters Now
The urgency of AI contract management is not theoretical. Two forces are converging to create the highest volume of contract renegotiation activity in a generation.
First, AI is reshaping the economics of services contracts. Organizations evaluating agentic AI for legal operations are finding that. Gartner’s May 2026 research warns: “SPVM leaders should assume most of these legacy contracts are structurally misaligned with today’s realities of AI-driven delivery and automation-led productivity. The goal is not just to ‘modernize language,’ but to reprice risk, reset incentives and reclaim control and visibility that legacy labor arbitrage contracts no longer provide.” Organizations that signed services contracts before the current wave of AI automation are paying for human labor that is increasingly performed by software. Every one of those contracts needs review.
Second, Gartner predicts that “by 2029, 75% of new managed AI service contracts will explicitly mandate liability, explainability standards, and model drift monitoring rights.” This means new contract types are emerging that require entirely new review frameworks. Legal teams need to evaluate AI governance clauses, data rights provisions, and model training restrictions that did not exist in standard contract templates two years ago.
The combination of legacy contract renegotiation and new AI contract complexity creates a volume challenge that manual review processes cannot absorb. Organizations need AI contract management not as a nice-to-have efficiency tool, but as a prerequisite for managing the contract portfolio at the scale and speed the market now demands.
This is precisely why contract management cannot remain a standalone function. The contract renegotiation supercycle affects procurement (who manages vendor relationships), finance (who controls spend commitments), legal (who reviews terms), IT (who evaluates technical provisions), and compliance (who monitors ongoing obligations). A tool that serves only one of these stakeholders misses the cross-functional nature of the challenge.
According to Gartner: “From 2026 to 2028, improving legacy services contracts is no longer optional. AI and automation have already broken the economic logic of most legacy agreements. IT SPVM leaders who act decisively can reclaim value, reduce risk, and reset partnerships.”
Gartner’s research on AI adoption in procurement adds further context: “According to the 2025 Gartner CPO Agenda Poll, over half (53%) of CPOs view accelerating AI use in procurement as one of the most urgent and critical actions for their success.” Yet “only 14% of respondents have fully implemented the technology in sourcing and procurement.” The gap between urgency and implementation is where platforms that combine AI contract management with procurement orchestration create the most value.
For organizations evaluating their approach, the question is whether to add another standalone tool to an already fragmented technology landscape, or to invest in a platform that connects contract intelligence to the procurement workflow where it drives decisions. The answer depends on whether you view contract management as a legal function or as part of procurement operations.
Frequently Asked Questions
What is AI contract management software?
AI contract management software uses artificial intelligence to automate contract creation, review, negotiation, compliance monitoring, and renewal across the contract lifecycle. Advanced platforms go beyond document summarization to provide change detection, risk categorization, and compliance tracking. Opstream’s AI Document Comparison analyzes vendor contracts against previously approved versions, categorizing every change by domain (legal, commercial, privacy, IP, liability, termination) with materiality flags and side-by-side comparison. The most effective implementations embed contract AI within procurement orchestration, connecting contract review to intake, approvals, vendor management, and invoice reconciliation.
How does AI improve contract review and compliance in procurement?
AI improves contract review by automating the comparison of new contracts against organizational standards or previously approved versions, identifying deviations that would take hours to find manually. For compliance, AI extracts key dates, obligations, and regulatory requirements during review, then monitors them continuously. Gartner recommends organizations “prioritize mature, proven AI use cases such as contract compliance monitoring and automated document summarization.” In Opstream, compliance gates are embedded in the approval flow, meaning requests cannot advance until compliance requirements are met. This makes compliance proactive rather than reactive.
What is the difference between standalone CLM and integrated contract management?
Standalone CLM tools manage contracts as independent documents: they review, store, and monitor agreements without access to procurement context. Integrated contract management embeds contract review within the procurement workflow, connecting each contract to the intake request that initiated it, the vendor history, the spend data, and the compliance status. The practical difference is significant: a standalone CLM reviewer sees a contract. An integrated reviewer sees the contract plus the full vendor relationship, the budget impact, and the compliance posture. Opstream integrates AI Document Comparison within a full procure-to-pay platform, so contract review happens with complete context.
How does AI Document Comparison work in procurement workflows?
AI Document Comparison automates the process of identifying what changed between two versions of a contract or vendor document. In Opstream, when a vendor submits a renewal contract, updated DPA, security exhibit, or pricing attachment, the system compares it against the previously approved version. Every change is categorized by domain: legal terms, commercial conditions, privacy and security, intellectual property, liability, and termination. Materiality flags highlight changes that require attention versus cosmetic edits. A side-by-side viewer shows additions, removals, and modifications with color-coded highlighting. The analysis is connected to the vendor record, spend history, and approval workflow, so reviewers have full context.
What should organizations look for in AI contract management software?
Five evaluation criteria separate effective AI contract management from feature marketing: (1) procurement context, meaning the AI reviews contracts connected to intake requests, vendor history, and spend data; (2) post-signature automation, meaning contract execution triggers PO creation, vendor updates, and compliance tracking automatically; (3) all-category coverage, meaning the system adapts review criteria across services, software, hardware, consulting, and facilities contracts; (4) proactive renegotiation intelligence, meaning the platform surfaces renewal and renegotiation opportunities based on spend trends and vendor performance; and (5) unified data architecture, meaning vendor, contract, and spend data are normalized and deduplicated before AI analysis begins.
Why does contract management need procurement data to work effectively?
Contract management without procurement data creates three critical gaps: no connection to the request that initiated the contract, no connection to the vendor’s full history and compliance status, and no connection to downstream processes like PO creation and invoice matching. Gartner’s research confirms that “access to and quality of procurement data explains 30% of analytics success, more than talent (18%) and technology (9%) combined.” When AI contract review operates on isolated document data, it produces technically accurate but contextually incomplete analysis. Opstream solves this by unifying vendor, contract, spend, and request data into a single semantic model, so every contract is reviewed with the full weight of the procurement relationship behind it.
How far ahead of a renewal should contract review start?
Start before the notice window closes, not at the renewal date. For significant contracts, many teams begin at least 90 days out, and earlier for strategic contracts that may go to a competitive process. In Opstream, a review workflow can trigger automatically 90 days before the renewal date, with the contract, spend and vendor status attached.
Does AI contract review replace legal review?
No. AI review finds and categorizes what changed between versions and flags the material changes, so legal spends its time on the clauses that matter. Legal still decides whether to accept, push back or escalate. The gain is faster triage with procurement context, not removing lawyers from the loop.
References
Sources cited in this article:
1. Gartner, “Magic Quadrant for Contract Life Cycle Management,” Kaitlynn Sommers, Kerrie McDonald, Lynne Phelan, November 10, 2025.
4. Gartner, “Peer Lessons Learned for Contract Life Cycle Management Solution Implementation,” Peer Community Contributor, May 29, 2026.
5. Gartner, “5 Steps to Prepare for the Coming Services Contract Renegotiation Supercycle,” Brett Sparks, Anurag Bora, May 25, 2026.
6. Gartner, “Top Technology Markets for Chief Procurement Officers,” Christian Titze, Magnus Bergfors, Kaitlynn Sommers, June 9, 2026.
7. Gartner, “Generative AI Use Cases in Sourcing and Procurement,” Alex Brady, March 6, 2026.
8. Gartner, “Impact of AI on Procurement Strategy: A CPO’s Guide,” 2026.
9. World Commerce & Contracting, “Contract Management: An Overlooked Driver of Business Agility and Financial Performance,” August 4, 2025. worldcc.com
10. The Hackett Group, “The Hackett Group Reports Rapid Progress in Procurement’s AI Agenda,” March 17, 2026. thehackettgroup.com
GARTNER is a registered trademark and service mark of Gartner, Inc. and/or its affiliates in the U.S. and internationally and is used herein with permission. All rights reserved. Gartner does not endorse any vendor, product, or service depicted in its research publications and does not advise technology users to select only those vendors with the highest ratings or other designation. Gartner research publications consist of the opinions of Gartner’s research organization and should not be construed as statements of fact. Gartner disclaims all warranties, expressed or implied, with respect to this research, including any warranties of merchantability or fitness for a particular purpose.
About the Author
Lihi Lutan
Co-Founder and CEO, Opstream
Lihi Lutan is the Co-Founder and CEO of Opstream, changing the way companies buy. Throughout her career, Lihi built and scaled business operations at startups and large corporations. Early in her career, Lihi was with Cyota (acq. RSA Security) as a team leader and project manager before moving to Thomson Reuters and Fundtech to manage global projects. Later, Lihi joined Taboola (NSDQ: TBLA) as employee 15, as VP Professional Services and Operations, leading the department as the company scaled from $8M to $1B in revenue. Transitioning from Taboola to StokeTalent (acq. Fiverr), Lihi served as the company’s COO. Lihi holds an LLB of Law and BSc of Computer Science from Tel Aviv University.